ABOUT US / FRONTEC

Behind every building
are people.

We deliver the work. We bring the capacity of dozens of construction crews to private clients and B2B investors.

SpecialityConstruction delivery
ResourcesDozens of crews
CooperationPrivate and B2B clients
Crew building a detached house — AI visualisation

CONSTRUCTION DELIVERY IS OUR SPECIALITY

From the facade
to the final detail.

FRONTEC provides construction, facade and insulation works and interior finishing. We work for private clients and businesses, from individual homes to residential developments.

Our resources include dozens of construction crews. Every partnership starts with a specific project: scope, location, documentation and preferred dates.

Tell us about your project ↗
Frontec team discussing a project action plan in a conference room

PEOPLE AT FRONTEC

Our team

Every project is backed by a team connecting office operations with work on site. Together, we make sure installers have the materials, information and support they need to work efficiently.

Procurement

Organises materials and tools to match the scope and work schedule.

Logistics

Plans deliveries, travel and the movement of equipment between projects.

Accounting and administration

Handle settlements, documents and day-to-day cooperation.

On-site support

Our field staff support installers, coordinate installations and connect the site with the office. They follow up on arrangements and help resolve everyday issues.

OUR SERVICES

Three areas.
One partner.

Choose a service and see
how delivery can work.

02 / FACADES AND INSULATION

Facades
and insulation

Substrate preparation, thermal insulation, reinforcement layers, rendering, painting and detailing.

All services ↗View case study ↓

OFFICE AND SITE IN ONE SYSTEM

Central management

One CRM. All organisational information in one place.

Frontec organises its work through a CRM connecting the office, coordinators and installation crews. It brings together information on projects, schedules, tasks, documentation, procurement and arrangements with clients.

A manager sends an instruction or message from the office, and the employee receives it in the mobile app. Shared information helps everyone know what to do, where and when, while coordinators follow progress and respond to current needs.

A manager sends a CRM task and a Frontec worker receives it on a phone

FROM NEED TO DELIVERY

Service case studies.

These case studies are illustrative cooperation scenarios, not records of completed FRONTEC projects. They show our proposed approach. Images are illustrative.

House blockwork — AI visualisation01

ILLUSTRATIVE CASE STUDY / CONSTRUCTION / HOUSE

Masonry works
for a detached house.

Scope: walls · openings · preparation for subsequent stages

The challenge

The homeowner needs walls built to the design, with accurate dimensions, correctly positioned openings and readiness for the next trades.

Proposed approach

  1. Review the design and confirm the scope with the investor and site manager.
  2. Agree materials, deliveries and sequence of works.
  3. Set out and build the walls, checking plumb, levels and opening dimensions.
  4. Inspect the work and agree readiness for the next stage.

Expected result and acceptance criteria

Walls built to the agreed documentation. Checks cover geometry, opening positions, joint quality and completion of the scope.

Discuss your construction works ↗
Insulation work at a residential development — AI visualisation02

ILLUSTRATIVE CASE STUDY / FACADES / B2B

Building facades
for a new development.

Scope: insulation · rendering · facade details

The challenge

The investor needs a consistent finish across several buildings. Facade work must account for access to work areas and other contractors.

Proposed approach

  1. Agree documentation, insulation system, colours and building sequence.
  2. Inspect substrates and prepare work packages for the crews.
  3. Install insulation, reinforcement layers, rendering and details to the agreed system.
  4. Stage inspections and completeness checks before final handover.

Expected result and acceptance criteria

A visually consistent facade, complete details and continuous insulation. Acceptance checks the design, surface finish, joints and flashings.

Let's discuss your facade ↗
One room before and after finishing with a Frontec worker03 / INSPIRATION PHOTO

ILLUSTRATIVE CASE STUDY / INTERIORS / APARTMENT

From shell condition
to a finished interior.

Scope: skim coating · painting · plasterboard · tiling and floors

The challenge

The apartment owner wants several finishing trades coordinated, with a clear sequence and consistent transitions between walls, floors and fitted structures.

Proposed approach

  1. Agree the finish standard, materials and exact scope room by room.
  2. Assess substrates, protect the apartment and coordinate deliveries.
  3. Install structures, prepare walls, tile, paint and lay floors in the sequence required by the materials.
  4. Check surfaces, joints and details, then inspect with the investor.

Expected result and acceptance criteria

Finished surfaces to the agreed standard. Checks cover evenness, paint finish, grout, material joints and the accepted scope.

Ask about interior finishing ↗

HOW TO START WORKING TOGETHER

First, we understand the project.
Then, we agree the delivery.

01

Send your scope

Tell us the location, type of works, area and preferred dates. Attach documentation to your email.

02

Let's agree the details

We clarify technology, materials, responsibilities and acceptance procedures.

03

Let's plan the works

Once feasibility is confirmed, we agree the quotation, scope and programme.

YOUR PROJECT. OUR EXPERTISE.

Let's discuss
your investment.